Appendix A – M24 Fluokit Disposal Procedures. Fluokit Indoor Ring Main Units contain Sulphur Hexafluoride (SF6) gas as an insulating medium which is. AIR INSULATED SWITCHGEAR. FLUOKIT M+ MV modular switchgear up to 24kV. Technical Specifications. AREVA T&D. Summary. Cubicle equipment. FLUOKIT M+ cubicles include the following features: Operating Cubicles in the FLUOKIT M+ range all have functional . Fluokit M24 & M24+ meets your.

Author: Zulusho Zulkikazahn
Country: Cyprus
Language: English (Spanish)
Genre: Finance
Published (Last): 15 July 2013
Pages: 43
PDF File Size: 11.36 Mb
ePub File Size: 17.7 Mb
ISBN: 148-8-77973-965-3
Downloads: 85198
Price: Free* [*Free Regsitration Required]
Uploader: Akinobei

ECOFIT Fluokit M24/FP | Schneider Electric

Access to the substation. The height of the top coat must arrive between 0 and 2mm below the height of the irons. Installation of the switchboard. For any assistance or advice, contact the Schneider Electric After-Sales department.

Next, discover our energy and sustainability services, including big data management, to turn this vision into your business reality. Fit shims below the sections 1 and 2 to set their level. Geometry of the cable trough. Schneider Electric request the carefully reading of the following instructions in order fluokkit familiarize yourself with the product in this document before trying to install, operation, put into service or conduct the maintenance on it.

Pouring the cement top coat On the un-surfaced exposed concrete, pour a top coat of smooth finish, without ballast. Re-installation of the circuit breaker Proceed with the operations in the reverse order for rei nstalling the circuit breaker.

FLUOKIT M24+ – Operation Maintenance Instructions

Reserve opening for connecting the earthing cable. On fluokig un-surfaced exposed concrete, pour a top coat of smooth finish, without ballast. Non respect of these instructions is likely to invalidate any guarantee.

The other brand names mentioned within this document, whether they be copyright or not, belong to their respective holders. The interventions described are carried out on de-energized equipment in the course of being installed or locked out non operational.

  865PE NEO2 PDF

Schneider Electric declines any responsibility for the following points: Installation of the frame. Contact the Schneider Electric service unit for diagnoses and advice: Realign the passage on the front inner edge of the cable trough. Generally this depth [P] is equal to generally higher than the bend radius of the cables [R]. It can be used in a wide range of application fields such as utilities, wind parks, industry, buildings, infrastructure and consumer substations.

Symbols of information 06 Code for a product recommended and marketed by Schneider Electric 21 Nm Tightening torque value Example: Preparation of the sections.

Brosur Cubicle Fluokit m24

In this case a mounting base is added to the lower part of each Functional Unit in order to facilitate the penetration of the cable and respect the bend radius necessary for its connection. Secondary Air Insulated Switchgear. Certain passages must be sufficient for free movement and execution of operation and maintenance manoeuvres, – leave the room’s access door free, – take all measures to prevent all incidence of climatic conditions humidity, pollution, etc.

Floor openings under the Functional Units 6. Reserve opening at the extremity of each rail.

Passages must be designed to permit easy maintenance for all of the substation’s elements circuit breaker, transformer, etc. These openings are to be calculated and carried out at the same time as the installation of the equipment to the floor.

Painted sheet steel 2 mm thick. For these specific cases, contact the Schneider Electric Sales Department. All manipulations must be completed once started. Layout of the Functional Units.

Except when it is imposed, the wearing of the gloves has been voluntarily limited in this manual so as to have clear visuals of the hands and operations described. Smooth finish top coat Un-surfaced fluolit concrete 9. Rear deflectors Wall fixing bracket mm min. Local requirements especially about vluokit and which are in accordance with the indications given in this document, must be observed. Installation of the switchboard The positioning of the Functional Units is primordial for: Each profile section comprises, every mm, a fixing plate welded and drilled with 2 holes of The delimitation of the civil engineering layout depends on the type and quantity of materials to be installed refer fljokit the following chapters.

  LESSONS IN TRUTH H.EMILIE CADY PDF

Switchboard back-to-back against a wall or not, with internal arc withstand. Symbols and important safety informations. Not respecting these instructions is likely to invalidate any guarantee. This condensation can be avoided by an appropriate lay-out of the room or of the building suitably adapted ventilation, air driers, heating etc.

Its thickness must be about 70mm of cement dosed at kg of CPA. Our products are fully quality controlled and tested at the factory in accordance with the standards and regulations currently in force.

Threaded fasteners with grease: Nevertheless, if the room’s architecture does not permit this type of installation, other options exist in order to meet the requirements of Standard IEC FLR rear access, internal arcing etc.

This opening must have a section of about 40x40mm to allow for the passage of the 25mm2 cable. Local safety requirements which are in accordance with these instructions, especially those regarding the safety of product operators and other site workers, must be observed. Examples of the installation of Functional Units with internal arc deflectors.

Position and adjust the rails in height by acting on the adjusting nuts. The room must be equipped with standardised high level and low level ventilation. Preparation of the sections Two profile sections n24 be laid out, one at the rear and one at the front, in the lengthwise direction of the switchboard.