IACS UR E10 PDF

IACS UR E10 PDF

The regulatory requirements in maritime and offshore applications are defined by the standards IEC for maritime navigation and radio communication. IACS Unified Interpretations were created with a view to the uniform The Implementation dates of the Unified Requirements (UR) and Unified Interpretations (UI) are shown in the “Implementation Date” column of the tables. UR E10, Rev. 年7月15日 IACS UR E10 – CCS 关于执行UR E10 (Rev.5)-型式认可试验规程要求的通知.

Author: Kigalmaran Akim
Country: United Arab Emirates
Language: English (Spanish)
Genre: Relationship
Published (Last): 15 May 2013
Pages: 310
PDF File Size: 20.76 Mb
ePub File Size: 18.88 Mb
ISBN: 936-1-90463-217-4
Downloads: 4913
Price: Free* [*Free Regsitration Required]
Uploader: Kabei

Electrostatic discharge IEC Contact discharge: Pipes and Pressure Vessels S: For equipment installed on the bridge and deck zone, the test levels shall be increased to 10V rms for spot frequencies in accordance with IEC at 2, 3, 4, 6.

The period of testing in each position should be sufficient to fully evaluate the behaviour of the equipment. Interval between each application: Damp heat IEC Publication test Db – measurement of insulation resistance before test; – equipment operating during the complete first cycle and switched off during second cycle except for functional test; – functional test during the first 2 hours of the first cycle at the test iacz and during the last 2 hours of the second cycle at the test temperature; – recovery ru standard atmosphere conditions; – insulation resistance measurements and performance test.

However, equivalent testing procedure may be accepted by the individual Society provided that the Unified Requirements stated in the other columns are fulfilled. Protection e100 cryogenic leakage and control of hazardous zones in fuel preparation rooms on open deck. These inclination tests are normally not required for equipment with no moving parts. Relevant tests are as listed in the Table.

  CIRCULANT MATRICES PHILIP DAVIS PDF

For severe vibration conditions such as, e. Special consideration within the risk assessment of closed or semi-enclosed bunkering stations. Using the directions defined in a to d above, the equipment is to be rolled to an angle of Recent revisions and changes have been underlined for easy reference. External surface area of the tank for determining sizing of pressure relief valve paragraph 8.

Control and maintenance of pressure and temperature of liquefied gas fuel tanks after the activation of the safety system.

IACS UR E10_图文_百度文库

No degradation of performance or loss of function is allowed as defined in relevant equipment standard and the technical specification published by the manufacturer. Mobile Offshore Drilling Units E: Salt mist test is to be carried out for equipment installed in weather exposed areas.

Critical frequency is a frequency at which the equipment being tested may exhibit: Test criteria based upon application. Passenger Submersible Craft SC: Sweep over a restricted frequency range between 0. Equipment is to be tested in its normal position if otherwise not specified in the test specification.

UR E – Electricity

Appropriate location of premixed engines using fuel gas mixed with air before the turbocharger. Selective disconnection or shutdown and equipment operable after an emergency shutdown. According to level 2 severity standard Single pulse time: Electrical and electronic equipment on board ships, required neither by classification rules nor by International Conventions, liable to cause eletromagnetic disturbance shall be of type which fulfill the test requirements of test specification items 19 and Strength of Ships W: During the test, degradation or loss of function or performance which is self recoverable is however allowed but no change of actual operating state or stored data is allowed.

  ACTIVBOARD 500 PRO PDF

No degradation of performance or loss of function is allowed as defined in the technical specification published by the manufacturer.

Mooring, Anchoring and Towing C: Approval of consumables for welding normal and higher strength hull structural steels. Notes to Test No. The test in each direction is to be carried out for not less than 15 minutes.

Texts of the IACS Unified Requirements and Unified Interpretations are made available iads this page for the period of one year following the date of adoption. The EUT shall continue to operate as intended after the tests.

Materials and Welding Z: Equipment to be mounted in consoles, housing etc. The Equipment Under Test shall continue to operate as intended during and after the test.

IACS Unified Requirement and Unified Interpretation | ClassNK – English

Shipboard fittings and supporting hull structures associated with towing and mooring on conventional ships. The outlines of technical resolutions adopted by IACS are available at the links shown below. More severe conditions may exist for example on exhaust manifolds of diesel engines especially for medium and high speed engines.